If you are the Senior Patrol Leader, two parts of TroopPlanner were built for your job: the agenda for your Patrol Leaders' Council, and the plan for the year ahead. Most Scouts never find either. Here they are.
Open Events in the sidebar. Look for PLC Meetings and Planning.
Missing one or both? There are two reasons, and neither is a fault.
Your troop may not use it. Both are switches a troop turns on. The year plan in particular is off unless somebody asks for it.
Your position may not carry it. These pages need a fair amount of Events permission — usually the SPL has it and a patrol leader does not. Your troop decides that in its own permission grid, so ask your Scoutmaster rather than guessing.
Your troop keeps one agenda template: the items that come up at every PLC. Opening a roll, patrol reports, the next campout, announcements — whatever your troop always does.
A new PLC meeting starts with no agenda at all. Open the meeting and there is a prompt to build one from the template. One tap copies every standard item across.
Then make it this meeting's agenda: add the items that only matter this time, take out the ones that do not apply, and drag things into the order you want to run them.
Generating only works on an empty agenda. Once there are items on it, the template will not overwrite your work.
The template is not fixed. If something gets added by hand at every single meeting, put it in the template and stop retyping it.
That is the part worth handing on. An SPL who leaves a good template behind has made the next SPL's job easier, and that is a real piece of leadership rather than a paperwork chore.
Planning shows a rolling grid, this month and the thirteen after it. Each month panel carries the jobs that belong to that month and any draft events already pencilled in.
It answers the question a PLC is bad at: not "what are we doing next week" but "who is booking the summer camp, and is it already too late".
Take it to the annual planning conference and work down it month by month. It is a much better prompt than a blank whiteboard.
Scouting says the youth run the program. The software does not hand over everything, and it is better to know that now than to find out in front of the PLC.
Almost always a switch or a permission.
| What happened | What to do |
|---|---|
| There is no Planning in my Events menu | The year plan is off unless a troop asks for it. Ask your Scoutmaster whether they want it switched on. |
| There is no PLC Meetings either | Either the same answer, or your position does not carry enough Events permission. Ask which. |
| The generate button did nothing | The agenda already has items on it. Generating only fills an empty one, so your work cannot be wiped by a stray tap. |
| The template is empty | Nobody has built it yet. That is a good first job: put in the things your PLC does every time. |
| I can see the year plan but cannot change it | You have read access, not edit. Go through it with an adult who can check items off, or ask about the permission. |
| The PLC meeting itself is not there | A PLC meeting is an event like any other, and somebody has to create it. Ask, or create it if you are able to. |
Try the other guides, or ask your Scoutmaster.